Wildlife impact assessment and summary of previous mitigation related to hydroelectric projects in Montana : volume one, Libby Dam project -- operator, U.S. Army Corps of Engineers
Wildlife impact assessment and summary of previous mitigation related to hydroelectric projects in Montana : volume one, Libby Dam project -- operator, U.S. Army Corps of Engineers
Description
Includes bibliographical references.
Creator
United States. Bonneville Power Administration. Division of Fish and Wildlife
Portland, Ore. (P.O. Box 3621, Portland 97208) : Bonneville Power Administration, Division of Fish and Wildlife,
Digital Collection
Montana State Publications
Digital Format
application/pdf
Digitization Specifications
The Scribe machine captures page images with two digital singe lens-reflex (DSLR) cameras, the Canon model 5D/12.8 mega-pixel camera and the Canon EF 100 mm f 2.8-macro lens. Newer versions, if deemed better by vendor, will be implemented. Color images in JPEG2000 format (300-500 PPI). Optical Character Recognition (OCR) in two XML formats ABBYY and DjVu. OCR XML character format is UTF-8. Newer versions, if deemed better by vendor, will be implemented.
Post a Comment for Wildlife impact assessment and summary of previous mitigation related to hydroelectric projects in Montana : volume one, Libby Dam project -- operator, U.S. Army Corps of Engineers